Jobs Maintenance - Completing a Work Order

This article is part of the Jobs Maintenance section.
Once you have sent out a Work Order to the contractor, the Job moves to Stage 3.
Stage 3: Complete Work Order
After the contractor has completed the job, you can mark the Work Order as completed.
To do this:
- Navigate to the Jobs Maintenance tab.
- Find your job in the grid. If Stage 2 has been completed, it will open at the Stage 3: Complete Work Order tab.
- Enter completion details that will have been provided by the contractor:
- Contractor & Description - these details will have pulled through from Stage 2.
- Arrival On Site Date & Arrival On Site Time - when did the contractor arrive on site to complete the work.
- Job Completion Date & Job Completion Time - when was the work completed.
- Time Taken - this will calculate automatically based on what is entered above.
- See Invoice – you will only be able to use this feature once you have recorded an invoice as received.
- Job Completed – Click Yes if the job was successfully completed

- Click the Complete Work Order button


- Click OK to dismiss the confirmation and close the Jobs window.
- The status will change to CAI - Complete and Awaiting Invoice.
- The Stage 3 screen will also update with details of the user who completed the Work Order.
Recording an invoice received
Jobs at CAI status will only be marked as fully complete once an invoice has been submitted by the contractor.
There are several ways to record an invoice as received. Once you have done this the job status will change to EXC.
Purchase Ledger Transactions
In-Tray
Follow the steps in the
In-Tray guides to link an invoice to a Job in the In-Tray.
Blockworx
If you are using Blockworx, the job will be marked as completed when the contractor submits their invoice through Blockworx.
This eliminates the need to manually mark it as completed at Stage 3.

Once an invoice has been linked to a job you can open the job and click See Invoice on the Stage 3 tab to see the PL Transaction Invoice Details and Hold File Details for that invoice.

You can unlink a scanned invoice, but you cannot link a new one. If you post the wrong invoice against a Work Order, please contact CPL Support to have it corrected.
Completing a Job Internally
There may be times when you want to complete a Job and archive it, but not require that it be invoiced. If you cancel a Job there is no audit trail, so instead you can mark it as Completed Internally.

This option can only be used for jobs at JIP or CAI status.
To mark a job as Completed Internally:
- Navigate to the Jobs Maintenance tab.
- Find your job in the grid. If Stage 2 has been completed, it will open at the Stage 3: Complete Work Order tab.
- Click the Complete Internally button.

- The job status will update to INC (Internally Completed).
- These jobs will no longer show on reports as outstanding.

Jobs at INC and EXC status are Archived in the main Jobs Maintenance tab, so you will need to tick Archived or All on the search filters to locate your job once it has been marked as completed.
Related Articles
Jobs Maintenance - Creating a Work Order
This article is part of the Jobs Maintenance section. Find all related articles here: Jobs Maintenance Once you have created your job and contacted the contractor to check they are happy to accept the job, you will want to create a Work Order to ...
Jobs Maintenance - Sending Work Orders
This article is part of the Jobs Maintenance section. Find all related articles here: Jobs Maintenance Sending Work Orders Once you have created a Work Order and sent RAMS documents, you are ready to send the Work Order to your contractors. This can ...
Jobs Maintenance - Amending or Cancelling a Job
This article is part of the Jobs Maintenance section. Find all related articles here: Jobs Maintenance Jobs can be amended and cancelled at certain stages of the process. Amending a Job Jobs can be amended at Stage 2, after the Job has been created ...
Jobs Maintenance - Reporting
This article is part of the Jobs Maintenance section. Find all related articles here: Jobs Maintenance Reports There are several built-in reports that you can use to keep track of Jobs. These can all be accessed by selecting Reports - Jobs Reports ...
Jobs Maintenance - Job Statuses
This article is part of the Jobs Maintenance section. Find all related articles here: Jobs Maintenance Below is a list of all possible Job statuses. Code Description Notes CAN Cancelled Jobs will change to CAN when the Cancel button is clicked at ...